From The Trussville Tribune staff reports
ST. CLAIR COUNTY — Beginning at 8 a.m. on Jan. 14, weather permitting, the Alabama Department of Transportation will close either the right or left lane of I-59 southbound at various locations for clearing and grassing operations between the Etowah County line (Milepost 175) and the St. Clair Springs exit (Milepost 156).
All travel lanes are expected to reopen at approximately 5 p.m. on Jan. 14.
These same lane closures will be in place from 8 a.m. to 5 p.m. on Jan. 15 through January 19.
Motorists are requested by ALDOT to consider using alternate routes, adjust arrival/departure times, observe work zone speed limits and other work zone signs, and use extreme caution in this area.