From The Trussville Tribune staff reports
ST. CLAIR COUNTY – Beginning at 8 a.m., Monday, September 17, weather permitting the Alabama Department of Transportation will close either the right or left lane of I-59 Southbound at various locations for Paving, Grading, Guardrail Operations between the Etowah County line (Milepost 175) and the St. Clair Springs exit (Milepost 156).
All travel lanes are expected to reopen at approximately 7 p.m. on Monday.
These same lane closures will be in place from 8 a.m. to 7 p.m. from Tuesday, September 18 thru Saturday, September 22.
Motorists are requested to consider using alternate routes, adjust arrival/departure times, observe work zone speed limits and other work zone signs, and use extreme caution in this area. ALDOT thanks motorists for their patience during this construction operation to improve Alabama’s roadways.
ALDOT’s mission is to provide a safe, efficient, environmentally sound transportation network across Alabama. For further information, visit www.dot.state.al.us.