From the Trussville Tribune staff reports
ST. CLAIR COUNTY — Beginning at 8 a.m., Monday, October 1st, weather permitting the Alabama Department of Transportation will close either the right or left lane of I-59 Southbound at various locations for paving, clearing, grading, and guardrail operations between the Etowah County line (Milepost 175) and the St. Clair Springs exit (Milepost 156).
All travel lanes are expected to re-open at approximately 7 p.m. on Monday.
These same lane closures will be in place from 8 a.m. to 7 p.m. from Tuesday, October 2nd thru Saturday, October 6th
Motorists are requested to consider using alternate routes, adjust arrival/departure times, observe work zone speed limits and other work zone signs, and use extreme caution in this area. ALDOT thanks motorists for their patience during this construction operation to improve Alabama’s roadways.