From The Trussville Tribune staff reports
ST. CLAIR COUNTY — Weather permitting, the Alabama Department of Transportation will close either the right or left lane of I-59 Northbound at various locations for clearing and grassing operations between the St. Clair Springs exit (Milepost 156) and the Etowah County line (Milepost 175) beginning at 7 a.m., Monday, Jan. 7.
All travel lanes are expected to reopen at approximately 4 p.m. on Monday afternoon.
These same lane closures will be in place from 7 a.m. to 4 p.m. on Tuesday, Jan. 8, through Saturday, Jan. 12.
Motorists are requested to consider using alternate routes, adjust arrival/departure times, observe work zone speed limits and other work zone signs, and use extreme caution in this area. ALDOT thanks motorists for their patience during this Construction Operation to improve Alabama’s roadways.
ALDOT’s mission is to provide a safe, efficient, environmentally sound transportation network across Alabama. For further information, visit www.dot.state.al.us.