From The Trussville Tribune staff reports
MCCALLA — Weather permitting, on Wednesday, June 26 at 7 p.m., the Alabama Department of Transportation will be installing conduit along the bridge on I-459 northbound at Milepost 1.2 as follows:
- The conduit installation will require the outside (right) lane and shoulder of I-459 to be closed in the area of the work.
- All travel lanes will be re-opened to traffic no later than 5 a.m. on Thursday, June 27.
Motorists are requested to consider using alternate routes, adjust arrival/departure times, observe work zone speed limits and other work zone signs, and use extreme caution in this area.