From The Tribune staff reports
JEFFERSON AND ST. CLAIR COUNTY — Beginning at 4 a.m. on Monday, November 1st, weather permitting, the Alabama Department of Transportation will close the left lane of I-20 eastbound for Paving Work between the Leeds exit (Milepost 140) and just east of the Brompton exit (Milepost 148).
All travel lanes are expected to re-open at approximately 3 p.m. on Monday.
This same lane closure will be in place from 4 a.m. until 3 p.m. on Tuesday, November 2nd thru Saturday, November 6th.
Motorists are requested to consider using alternate routes, adjust arrival/departure times, observe work zone speed limits and other work zone signs, and use extreme caution in this area. ALDOT thanks motorists for their patience during this Construction Operation to improve Alabama’s roadways.
ALDOT’s mission is to provide a safe, efficient, environmentally sound transportation network across Alabama. For further information, visit www.dot.state.al.us.