From The Tribune staff reports
JEFFERSON COUNTY — Weather permitting, the Alabama Department of Transportation will conduct Pavement Repair Inspections on I-65 northbound and southbound in Birmingham between the 16th Street exit (Milepost 261) and Daniel Payne Drive (Milepost 264) as follows:
- Work will begin Monday, January 31 at 9 p.m.
- This work will require the two (2) northbound and southbound outside (right) lanes to be closed for short periods while work is being done. The lane closure will be handled as a rolling roadblock.
- All lanes are expected to be open to traffic by 5:30 a.m.
Motorists are requested to consider using alternate routes, adjust arrival/departure times, observe work zone speed limits and other work zone signs, and use extreme caution in this area. ALDOT thanks motorists for their patience during this Construction Operation to improve Alabama’s roadways.