From The Tribune staff reports
ST. CLAIR COUNTY — Beginning at 9 a.m., Monday, June 6, weather permitting, the Alabama Department of Transportation will have right or left lane closures on I-59 southbound for Guardrail work and Asphalt paving between mileposts 157 and mileposts 148.
All travel lanes are expected to re-open at approximately 6 a.m. on Tuesday, June 7.
These same lane closures will be in place from 9 a.m. to 6 a.m. on Monday, June 6, through Saturday, June 11.
Beginning at 7 p.m., Sunday, June 5, weather permitting, the Alabama Department of Transportation will have right or left lane closures on I-59 northbound for RCC shoulder operations between mileposts 157 and mileposts 148.
All travel lanes are expected to re-open at approximately 6 a.m. on Monday, June 6.
These same lane closures will be in place from 7 p.m. to 6 a.m. on Sunday, June 5, through Friday, June 10.
Motorists are requested to consider using alternate routes, adjust arrival/departure times, observe work zone speed limits and other work zone signs, and use extreme caution in this area. ALDOT thanks motorists for their patience during this Construction Operation to improve Alabama’s roadways.
ALDOT’s mission is to provide a safe, efficient, environmentally sound transportation network across Alabama. For further information, visit www.dot.state.al.us.