From The Trussville Tribune staff reports
IRONDALE — Weather permitting, March 13 at 9 a.m., the Alabama Department of Transportation will begin emergency bridge repairs on a spalled section of bridge deck at the following location:
- I-20 eastbound just east of Exit 132B.
- This will require the inside (left) two lanes to be closed in the area of work.
- All travel lanes will be re-opened to traffic no later than 3 p.m.
Motorists are requested to consider using alternate routes, adjust arrival/departure times, observe work zone speed limits and other work zone signs, and use extreme caution in this area.