From The Trussville Tribune staff reports
IRONDALE – Weather permitting, on Monday, October 15th and Tuesday, October 16th at 8 a.m., the Alabama Department of Transportation will be installing conduit along the bridge on I-20 Westbound at Milepost 138.541 between Bankhead Hwy/Hwy78 and I-459 as follows:
- The conduit installation will require the outside (right) lane and shoulder of I-20 to be closed in the area of the work. Following completion of work in the northbound lane, work will continue in the northbound lane at other bridges in a similar manner.
- All travel lanes will be reopened to traffic no later than 4:30 p.m.
Motorists are requested to consider using alternate routes, adjust arrival/departure times, observe work zone speed limits and other work zone signs, and use extreme caution in this area. ALDOT thanks motorists for their patience during this Maintenance Operation to improve Alabama’s roadways.
ALDOT’s mission is to provide a safe, efficient, environmentally sound transportation network across Alabama. For further information, visitwww.dot.state.al.us.