From The Trussville Tribune staff reports
ST. CLAIR COUNTY – Beginning at 7 a.m., Monday, October 15th, weather permitting the Alabama Department of Transportation will close either the right or left lane of I-59 Northbound at various locations for Paving, Clearing, Grading, and Guardrail Operations between the St. Clair Springs exit (Milepost 156) and the Etowah County line (Milepost 175)
All travel lanes are expected to reopen at approximately 4 p.m. on Monday.
These same lane closures will be in place from 7 a.m. to 4 p.m. from Tuesday, October 16th thru Saturday, October 20th.
Motorists are requested to consider using alternate routes, adjust arrival/departure times, observe work zone speed limits and other work zone signs, and use extreme caution in this area. ALDOT thanks motorists for their patience during this construction operation to improve Alabama’s roadways.